top of page


Beyond the Collapse: What Ponte Morandi Changed About Bridge Safety
On 14 August 2018, a 300-metre section of Genoa’s Ponte Morandi bridge collapsed during a rainstorm, sending vehicles and tonnes of concrete around 45 metres to the ground below. Forty-three people lost their lives. In the aftermath, attention quickly turned to what had gone wrong. The answer, however, was not as simple as a single failed component or one extreme weather event. A bridge with known problems Completed in 1967, the Ponte Morandi was an unusual cable-stayed bridg
22 hours ago


Australia's first mass timber airport terminal takes shape
As part of its $170 million terminal redevelopment, the airport has begun installing around 30 tonnes of engineered timber to create the striking roof structure of its new terminal. When complete, it will be Australia's first mass timber engineered airport terminal, giving travellers a distinctly different welcome to the region. The design brings together sustainability, functionality and a strong connection to the Sunshine Coast's natural surroundings. A structure with a pur
Oct 30


The Future of Infrastructure Delivery is Here (maybe)
Imagine an airship the size of three A-380 Airbuses hovering over outback Australia and lowering major payloads without ever touching the ground. French-Canadian company Flying Whales has been developing a heavy-lift airship called the LCA60T, designed to move bulky cargo into areas where roads, rail or conventional aviation are difficult, expensive or impractical. What is the LCA60T? The LCA60T, is a helium airship with a payload capacity of up to 60 tonnes (60,000kg). It is
Jun 29
bottom of page

